ROADWAY & BRIDGE RECONSTRUCTION
OCCASIONAL SINGLE LANE CLOSURES; LIMITED SHOULDER WIDTHS
7:00 PM - 7:00 AM, MONDAY THRU THURSDAY EASTBOUND
7:00 PM FRIDAY - 12:00 PM SUNDAY EASTBOUND
7:00 PM - 7:00 AM, MONDAY THRU THURSDAY WESTBOUND
7:00 PM FRIDAY - 2:00 PM SUNDAY WESTBOUND
NOTE: January 29 – 31, 2010 westbound right lane closure from 7:00 pm January 29 to 1:00 am January 31, 2010 between MP 35.8 and MP 38.6. Westbound Express E-ZPass will be closed from 6:00 pm to 8:00 pm on Saturday, January 31, 2010.
NOTE: Emergency pull-offs are located at one (1) mile intervals call boxes from MP 31 to MP 38 are out of service due to construction until further notice.
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
BRIDGE REPLACEMENT
OCCASIONAL SINGLE LANE CLOSURES
8:00 PM - 6:00 AM, MONDAY THROUGH THURSDAY
8:00 PM FRIDAY - 10:00 AM SATURDAY
7:00 PM SATURDAY - 11:00 AM SUNDAY
NOTE: Ramp traffic may be impacted by traffic stoppages for bridge construction activity. Flagmen control traffic.
NOTE: Call boxes from MP 45 to MP 49 are out of service due to construction until further notice.
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
ROADWAY & BRIDGE RECONSTRUCTION
OCCASIONAL SINGLE LANE CLOSURES
8:00 PM - 6:00 AM, MONDAY THROUGH THURSDAY
10:00 PM FRIDAY - 9:00 AM SATURDAY
5:00 PM SATURDAY - 10:00 AM SUNDAY
NOTE: February 2010 occasional traffic stoppages and/or paces, may occur from 6:00 am – 12:00 pm to provide construction access for construction equipment.
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
INTERCHANGE RAMP & BRIDGE REPLACEMENT
OCCASIONAL SINGLE LANE CLOSURES; SHOULDERS CLOSED
6:00 PM - 5:00 PM MONDAY THROUGH WEDNESDAY WESTBOUND
6:00 PM - 5:00 PM, MONDAY THROUGH WEDNESDAY EASTBOUND
6:00 PM THURSDAY - 11:00 AM FRIDAY BOTH DIRECTIONS
NOTE: February 2010 limited lane widths on the eastbound acceleration ramp due to the lane widths being 12 feet on the corner radius during construction.
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
EB Ramp = 12' - 0"
ROADWAY RECONSTRUCTION & 6 LANE WIDENING
8:00 PM - 6:00 AM, MONDAY THROUGH THURSDAY
9:00 PM - 7:00 AM, FRIDAY, LIMITED SHOULDER WIDTHS
8:00 PM - 9:00 AM, SATURDAY
9:00 PM - 6:00 AM, SUNDAY
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
EASTBOUND SLIP RAMP CONSTRUCTION
OCCASIONAL SINGLE LANE CLOSURES
7:00 PM - 6:00 AM, MONDAY THROUGH THURSDAY EASTBOUND
8:00 PM - 8:00 AM, FRIDAY EASTBOUND
MINIMUM LANE WIDTH
EB = 12' - 0"
WB = 12' - 0"
BRIDGE REPLACEMENT
OCCASIONAL SINGLE LANE CLOSURES
10:00 PM - 6:00 AM, MONDAY THROUGH THURSDAY NORTHBOUND
11:00 PM - 8:00 AM, FRIDAY NORTHBOUND
8:00 PM - 5:00 AM, MONDAY THROUGH THURSDAY SOUTHBOUND
10:00 PM - 7:00 AM, FRIDAY SOUTHBOUND
NOTE: On Sunday, February 28, 2010 (PLAN X) from midnight to 6:00 am all lanes will be closed, both directions, for overhead beam removal, along with other necessary work. Also, some single lane closures will be made on Saturday, February 27, 2010 in the nighttime to prepare for the Sunday closure.
MINIMUM LANE WIDTH
NB = 11' - 0"
SB = 11' - 0"
BRIDGE REPLACEMENT
OCCASIONAL SINGLE LANE CLOSURES
NOTE: Trucks and buses are required to be in the left lane only throughout the work area.
NOTE: No shoulder from MP A-73.5 to A-75.3 NB & SB; emergency pull-off NB & SB at MP A-74.5, both directions.
NOTE: February 2010 occasional traffic stoppages &/or paces, may occur from 10:00 am – 2:00 pm to blast rock excavation for bridge construction from MP A-73 to A-74.
NOTE: Call boxes at MP A-74.1 (NB & SB) and MP A-75.1 SB are out of service due to construction until further notice.
MINIMUM LANE WIDTH
NB = 12' - 0"
SB = 12' - 0"
PARTIAL BRIDGE REPLACEMENT
OCCASIONAL SINGLE LANE CLOSURES
7:00 AM - 5:00 PM, MONDAY THROUGH FRIDAY
SHOULDERS CLOSED
MINIMUM LANE WIDTH
NB = 12' - 0"
SB = 12' - 0"