Design & Construction Details

Milepost A48 - A53 Design & Construction Details

Total Reconstruction Project

Design Activities

Final design is currently underway for the mainline section of this corridor and environmental studies continue to advance in support of the environmental permitting process. Fieldwork is also underway to inform the design team of key features as they make every effort to minimize impacts to the community and the environment.

In recent weeks, you may have come across field crews conducting:

  • Utility Investigations - Subsurface utilities are being located off the shoulder of I-476 at Milepost A50.6, between Main Road West and Mill Road bridges.
  • Geotechnical Testing - Drilling is planned along the shoulders of I-476 northbound between the bridge over Chestnut Street and the northern project limit at Milepost A53, south of Lower Macungie Road. Work is scheduled to begin in mid-March and should last about 4 weeks, weather permitting. All work will be performed at night from Mondays through Thursdays.
  • Wetland Investigations – Additional fieldwork is planned to begin in mid-April and continue through mid-June. Work will be performed along both sides of the Turnpike between the bridges over Limeport Pike and Church View Road.

An Open House Plans Display was conducted on May 23, 2024. The team is working through the feedback provided and conducting follow-up studies as needed. Please note that the noise analysis displays shared at the public meeting are being updated and will be posted to the website when complete. Community noise meetings will be scheduled before final decisions are made on locations. Check out the News and Public Involvement page to review the Plans Display exhibits. A comment form is also posted if you have feedback. 

Construction Activities

Construction of the mainline widening is expected to begin in 2028. The status of the overhead bridge reconstruction is detailed below.

Indian Creek Road (SR 2018) Overhead Bridge Open to Two-way Traffic (Milepost A52.30)

  • Construction began in March 2023. The bridge plan may be found here.
  • The bridge is now open to two-way traffic and is considered substantially complete as scheduled.
  • Minor work will be under way into spring 2025 such as patching and stabilization. There may short-term lanes restrictions during this final phase of work.

       

      Vera Cruz Road (SR 2027) Overhead Bridge (MP A49.67) – Construction Complete

      Construction Completed in 2023

      More Project Resources

      Project Overview

      Learn about Milepost A48-A53 Total Reconstruction Project.

      Learn More

      News & Public Involvement

      Learn how we stay connected with the public about this project.

      Stay Updated

      Team & Contact Information

      Learn about the team that we will work with to complete the work on this project.

      Contact the Team