Current Activities
Final Design at 90% Complete
Current Detours
There are no detours at this time.
Proposed Construction Activities
Future construction activities include:
- Mainline widening outside of existing shoulders
- Reconstruction of the travel lanes
Four Week Lookahead
To Be Determined
Excess Excavation Areas
To Be Determined
Current Construction Activities
- No construction activities at this time
Completed Construction Activities
The existing Cider Road East and Cider Road West overhead bridges at MP 132.5 and MP 130.9 respectively needed to be replaced with longer structures to accommodate the future widening of the Pennsylvania Turnpike from four to six travel lanes. Construction of the Cider Road East bridge was completed in 2012 and Cider Road West was completed in 2013.