Design Update
Stay up to date on the latest updates from our design activities.
Winter 2025/2026 Update
- Final design of the Milepost 57–62 mainline widening has advanced toward 60% completion.
- Current design tasks include roadway, traffic control, E&S, stormwater, right of way, and drainage design.
- The widening is being coordinated with the MP 53-57 and MP 62-67 Total Reconstruction projects.
