Project Details
Preliminary Design began in 2013 on the future reconstruction and widening of the Mainline of the Pennsylvania Turnpike (I-76) from Milepost 302 to Milepost 308 in Chester County.
Project Summary:
Mainline, Total Reconstruction and Widening Project, MP 302 - 308
Engineering Design:
Summer 2013
Open House Plans Display:
To be determined
Mainline Construction:
View the Schedule. *These time frames are approximate and will be refined as the project advances.
Bridge Replacements:
SR 0345 Bulltown Road
View the Project Presentation board-draft.
T-45 Adams Drive