Skip to main content
September 20, 2024 Travel Advisory

Ramp Detour Scheduled at Cranberry Interchange


Ramp Detour Scheduled at Cranberry Interchange 

CRANBERRY, Pa. — Drivers are advised that, weather permitting, the entry ramp onto the Pennsylvania Turnpike (PA Turnpike) at the Cranberry Interchange (Exit 28) will be closed temporarily.  

As part of an ongoing repair and maintenance project at the Cranberry Interchange, the ramp that connects U.S. Route 19 (Perry Highway) southbound to PA Turnpike/I-76 westbound will be closed beginning Monday, Sep. 23 at 6 a.m. until Thursday, Oct. 24. Travelers wishing to take the PA Turnpike westbound from U.S. Route 19 southbound will be directed to the eastbound exit ramp for I-76, then follow signs to the westbound exit. A map of the detour can be found here 

The Cranberry Interchange project is scheduled to be completed in October 2025.  

To report an incident or other emergency on the PA Turnpike, dial *11 via mobile phone. To learn more about PA Turnpike conditions, use one of these resources:  

ON THE TURNPIKE  

511PA Smartphone App: real-time, hands-free PA traffic advisories 

Digital Message Signs: more than 200 boards along the Turnpike 

ON THE WEB  

511/511pa.com: live, interactive map  

X/Twitter: @PATurnpikeAlert 

BY PHONE 

511: dial from any PA roadway for local travel information 

Pennsylvania Turnpike Customer Assistance Center: 877-736-6727, Monday through Friday, 7 a.m. to 5 p.m.  

This roadwork is part of the Pennsylvania Turnpike Commission (PTC)'s mission to operate a safe, reliable, customer-valued toll road system that supports national mobility and commerce. In 2023, the PTC supported more than $690 million in construction bids for roadway maintenance and improvements to modernize the Turnpike and improve customer experience, including resurfacing more than 46 miles of roadway, undertaking total reconstruction of 27 miles of roadway, an all-time high, and replacing two major bridges at Beaver River and Hawk Falls. Find resources and planned construction projects at Traveling on the PA Turnpike | PA Turnpike. 

 

 

### 

 

Media Contacts:  

Crispin Havener, Assistant Press Secretary: (717) 870-2841, chavener@paturnpike.com  

Marissa Orbanek, Press Secretary: (267) 408-5151, morbanek@paturnpike.com