< Back to Archives

5-062 Details

5-062

Redecking and Widening of NB-355 at MP A57.66 and NB-360 at MP A58.88

Added

N/A

Due

December 21, 2007

Description

Engineering design services for the redecking and widening of Bridge Nos. NB-355 at MP A57.66 and NB-360 at MP A58.88 as well as the painting and rehabilitation of NB-367 at MP A60.33 and NB-369 at MP A61.11

Issuing Office

Engineering/Design

Presentation / Conference Date

December 31, 1899

Status

AWARDED

Awarded To

REMINGTON, VERNICK & BEACH ENGINEERS

Documents

View RFP PDF

Responding Vendor(s) / Team(s)

View Responded PDF