4-084
Full Depth Roadway Reconstruction Milepost A31 to A37.5
The Pennsylvania Turnpike Commission will retain an engineering firm to perform preliminary and final design services for the full depth roadway reconstruction project from Milepost A31 to A37.5 in Lower Salford, Franconia, and Salford Townships, Mon
Engineering/Design
December 31, 1899