ACTIVE TRAFFIC ADVISORIES (VIEW ALL):

Search


Please enter complete word or phrase. To search on a partial word, please add * after the partial word.

Match:
Search results for: camera in all categories

1197 results found.

60 pages of results.
Sorted by relevance / Sort by date
... and Northeast Extension locations. Work items include, but are not limited to: �€¢ Design, procure, install, integrate, test, train and maintain 21 new VMS, associated structures and equipment along the Turnpike. �€¢ Design, procure, install, integrate, test, train and maintain CCTV cameras, associated structures and equipment along the Turnpike. �€¢ Design, procure, install, integrate, test, train and maintain a 48-strand single mode fiber optic cable, riser-rated, end to end including all conduit and patch panels at each of the tunnels within this project. The fiber will be connected to ...
Terms matched: 1  -  Score: 273  -  29 Apr 2009  -  19103k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100369.pdf
... the AVC solution and Proposer�€™s Design for the following: a) Handling of stop and go and bumper-to-bumper traffic with vehicles that are spaced as closely as three (3) feet apart. b) Handling of lane straddling and lane changing. c) Providing redundancy in vehicle classification, vehicle framing, and camera triggers. d) Vehicle classification during degraded mode operations. e) Handling the environmental conditions in Pennsylvania, specifically heavy rain, fog and snow, and their impacts on vehicle detection, framing, and camera trigger. Explain how the Proposer�€™s Equipment selection and logic will prevent false detection and triggers in ...
Terms matched: 1  -  Score: 188  -  20 Dec 2016  -  28209k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100824.pdf
... facilitates coordinated response to all roadway incidents, supports maintenance and construction activities, coordinates planned and unplanned �€�Plan X�€ closures, and coordinates and supports major planned special events. The TOC operators are responsible for dispatching and coordinating with incident responders. The Commission currently operates more than 200 ITS devices including Closed Circuit Television Cameras (CCTV), Dynamic Message Signs (DMS), Roadway Weather Information System stations (RWIS), Highway Advisory Radio (HAR) transmitters, and various other subsystems. These devices and subsystems are of various age and manufacturer. In the current operational environment, in order to operate and view the status of ...
Terms matched: 1  -  Score: 148  -  26 Jun 2017  -  4564k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100868.pdf
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 110  -  39k  -  URL: http://www.paturnpike.com/cameras/
5. PART I
... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 43 V.7 .4 .2 Cameras........................................................... ...
Terms matched: 1  -  Score: 101  -  23 Apr 2010  -  2897k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100338.pdf
... , accurately count and accept coin payment both coin and bill payments, deliver correct change, including coin mechanism, bill, acceptors, coin and bill validators, change hoppers, bill cassettes, coin vaults, receipt issuing and printing devices, magnetic card readers; Violation Enforcement systems (VES) including but not limited to cameras, lens, housings, triggers, ancillary lighting storage, image compression, image compression conversion and inter related processes; Lane Status and Safety devices including canopy mounted traffic signals all associated firmware and processes; Digital Video Audit System (DVAS) including cameras, housings, lens, storage and retrieval systems, Patron Fare ...
Terms matched: 1  -  Score: 71  -  22 Nov 2011  -  65448k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100487.pdf
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 65  -  24k  -  URL: http://www.paturnpike.com/travel/advancedinfo.aspx
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 43  -  25k  -  URL: http://www.paturnpike.com/travel/trip_talk.aspx
... two (2) unit of each type � Two (2) Pavement sensors � Two (2) Weather Identifier and Visibility sensors � Two (2) Air Temperature/Relative Humidity sensors � Two (2) Barometric Pressure sensors � Two (2) Wind Speed and Direction sensors � Two (2) video camera assembly including lens and housing � Two (2) Fiber Optic Modems, if applicable As directed by the Engineer, deliver all equipment to the Commission�€™s, Project Manager in Highspire, PA. A30 of A31 Appendix A �€" Special Provisions, Conceptual Location Plan RWIS RFP CONCEPTUAL (OPTIONAL) ...
Terms matched: 1  -  Score: 41  -  26 Jan 2011  -  1167k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100468.pdf
... and installation of completely functional Dynamic Message Sign (DMS) systems, Closed Circuit Television Systems (CCTV) and the power and communications connections at each device location. Work items include, but are not limited to: �€¢ Design, procure, install, integrate, test and train for the operation of CCTV cameras, DMS and associated structures and equipment along the Turnpike and other roadways. �€¢ Design, procure, install, integrate, test and train for the operations of equipment to digitize (compress, encode and communicate via PTC-provided IP Addresses) CCTV camera video feeds and transmit to the existing central CCTV monitor equipment ...
Terms matched: 1  -  Score: 40  -  15 Aug 2012  -  62105k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100567.pdf
... January 2013 Finding Four: While the Turnpike Commission monitored, maintained, and inspected its tunnels, it has not implemented critical project management practices that would ensure recommendations resulting from tunnel inspections are not overlooked. In Finding Four we discuss the Turnpike Commission�€™s lack of safety-related devices including tunnels that do not have video cameras, fire detection systems, and suppression systems. The Turnpike Commission also lacks key project management components including an inspection database system that tracks tunnel inspections activities, and a single administrator who solely coordinates the tunnel work. To address Finding Four, we recommend that the Turnpike Commission should (1) install video cameras in ...
Terms matched: 1  -  Score: 38  -  05 Jun 2014  -  992k  -  URL: http://www.paturnpike.com/pdfs/business/finance/PTC_Report_final_01082013.pdf
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 33  -  21k  -  URL: http://www.paturnpike.com/toll/tollbyplate.aspx
... BY PLATE invoice. invoice. invoice. E-ZPass E-ZPass E-ZPass customers customers customers will willwill be be be billed billedbilled as as usual. as usual. usual. It It How How How Works It WorksWorks TheThe The cashless cashless cashless tolling tolling tollingfacility facility oror facility gantry or gantry isis gantry equipped is equipped equipped with with cameras with cameras cameras that that that capture capture capture each eacheach vehicle�€™s vehicle�€™s vehicle�€™s license license license plate. plate. TheThe plate. The registered registered registered owner ownerownerof oftheof the the vehicle receives vehicle vehicle receives receives a PA Turnpike a PAaTurnpike PA Turnpike TOLL TOLL BY PLATE ...
Terms matched: 1  -  Score: 32  -  01 May 2017  -  9763k  -  URL: http://www.paturnpike.com/pdfs/tolls/tolls_2017/2017_Tolls.pdf
... not-to-exceed amount of $110,078,553.06; b. Change Order #3 and Final Payment for Contract #T-154.42F004-3-02 for renovations of the PA State Police barracks at the Everett Maintenance Facility with eciConstruction, LLC, for an increase of $32,939.00 for a change the in camera specs to cameras that are compatible with the PTC camera system; for a final contract value of $3 ,591,319.78 and final amount due to the contractor of $223,583.29.-was made by Commissioner Deon, seconded by Commissioner Lieberman, and passed unanimously. � PSPC ...
Terms matched: 1  -  Score: 28  -  08 Apr 2015  -  92k  -  URL: http://www.paturnpike.com/pdfs/about/meetings/03172015_Minutes.pdf
... not-to-exceed amount of $110,078,553.06; b. Change Order #3 and Final Payment for Contract #T-154.42F004-3-02 for renovations of the PA State Police barracks at the Everett Maintenance Facility with eciConstruction, LLC, for an increase of $32,939.00 for a change the in camera specs to cameras that are compatible with the PTC camera system; for a final contract value of $3 ,591,319.78 and final amount due to the contractor of $223,583.29. 8. Approve the award of services and authorize the negotiation and execution of an agreement with the ...
Terms matched: 1  -  Score: 28  -  17 Mar 2015  -  84k  -  URL: http://www.paturnpike.com/pdfs/about/meetings/03172015_Agenda.pdf
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 26  -  34k  -  URL: http://www.paturnpike.com/
... a Permit Placarded Loads Commercial E-ZPass close Tolls/ E-ZPass Paying with Cash/Credit Paying With E-ZPass Paying With PA Turnpike Toll By Plate E-ZPass violations No Cash Zone- Cashless Tolling Paying a Certificate of Passage (COP) E-ZPass Only Interchanges GoPak Registration Rental Vehicles Toll Calculator/ Printable Schedules close Travel Tools Travel Conditions Map Traffic Cameras Toll Calculator/ Printable Schedules List of Travel Advisories Preferred Traveler PA Turnpike TRIP PROGRAM Design& Construction Service Plazas Maps& Reference Turnpike Safety Motorcade Guidelines close Doing Business General Information Vendor Registration VENDOR GUIDE PROCUREMENT RFPS, BIDS& AUCTIONS Make a Payment Financial/Planning Broadband P3 close About Us Turnpike Officials Transparency Employment/ Internship ...
Terms matched: 1  -  Score: 26  -  34k  -  URL: http://www.paturnpike.com/default.aspx
... traveling on the Northeastern Extension (I-476) through the southbound Lehigh Tunnel that they may experience delays due to intermittent, 20-minute traffic paces scheduled between 11 p.m. on Jan. 19 to 4 a.m. on Jan. 20. The paces are necessary to allow crews to safely perform tunnel inspections and camera maintenance. During each 20-minute pace, Turnpike maintenance and PA State Police vehicles will restrict Turnpike traffic to a speed of 20-25 miles an hour. Motorists in the area should be prepared for slow-moving traffic and possible stoppages. Work schedules are subject to change based on weather conditions. The Lehigh Tunnel is located at milepost ...
Terms matched: 1  -  Score: 25  -  19 Jan 2017  -  4k  -  URL: http://www.paturnpike.com/Press/2017/20170119122003.htm
... to the Lehigh Tunnel that the northbound tunnel will be closed Dec. 7 from 8 a.m. to 2 p.m. The southbound tunnel will be closed Dec. 8 from 8 a.m. to 2 p.m. The closures are necessary to allow crews to safely perform tunnel inspections and camera maintenance. By 8 a.m. on Dec. 7, the northbound tunnel will be closed and all traffic diverted into the southbound tunnel until 2 p.m. when the patterns are lifted. By 8 a.m. on Dec. 8, the southbound tunnel will be closed and all traffic ...
Terms matched: 1  -  Score: 25  -  07 Dec 2016  -  5k  -  URL: http://www.paturnpike.com/Press/2016/20161206084728.htm
... and time or predefined exception events associated with a transaction. The PTC operates in a 24x7 manner, as a result the software proposed must be capable of continuous operation. The system is to be installed in phases at each of the 36 toll collection plaza�€™s along the Mainline and the Northeast Extension. A camera must be installed at each plaza to view vehicles that enter the turnpike system and immediately U-turn into an exit lane. Cameras must also be installed at each plaza to ensure capture and viewing of vehicles exiting the turnpike system. The number of exit lanes varies per plaza with the size of the plaza and the number ...
Terms matched: 1  -  Score: 25  -  01 Dec 2006  -  119k  -  URL: http://www.paturnpike.com/OUTPUT/PDFs/RFPs/100244.pdf
Result Pages: 1 2 3 4 5 6 7 8 9 10 11 Next >>


Search took 0.043 seconds
Back
to
Top
PTCWEB01