General Construction Impacts
4/29/13 - 5/11/13
Day to Night (shifts 24 hours a day)
Walsh Construction and their sub-contractors will be working around the clock at various locations and neighborhoods adjacent to the six-mile construction area will experience general construction noise. Noise may include heavy equipment, lights (at night), vehicle-mounted safety lights (at all times), and backup alarms. All efforts are being taken to limit the impacts to the adjacent communities; however, night work is going to occur as needed and the PTC will not limit the contractor’s hours of operation.
Jolly Road Mainline Bridge
4/29/13 - 5/10/13
7 a.m. to 6:30 p.m.
Mermaid Lake, Jolly Road, Meadow Drive
4/29/13 - 5/11/13
7 a.m. to 6:30 p.m.
Roadway and Earthwork; Retaining Walls
Oak Ridge Drive, Rosewood Drive, East Side Drive
4/29/13 - 5/10/13
7 a.m. to 6:30 p.m.
Roadway & Earthwork; Sound Barriers
Sheffield Drive, Larchwood Drive, Old Arch Road
4/29/13 - 5/11/13
7 a.m. to 6:30 p.m.
Township Line Road Mainline Bridge
4/29/13 - 5/10/13
7 a.m. to 6:30 p.m.
Wentz Road Mainline Bridge
4/29/13 - 5/10/13
7 a.m. to 6:30 p.m.
Wentz Road, Horseshoe Drive, Lucy Drive, Michaels Lane, DeKalb Pike
4/29/13 - 5/10/13
7 a.m. to 6:30 p.m.
Roadway and Earthwork; Sound Barriers
All construction work is subject to change as result of contractor accessibility, productivity, and/or inclement weather.