Welcome to the
Milepost 31.04 - 37.82 photo album. Below you will find construction
progress pictures grouped by date or event. Feel free to browse the
project's pictures and click any picture to enlarge. The photo album
will be updated regularly so please check back often.

Westbound Bituminous Paving, MP 31.5 |

Westbound Tree Planting, MP 34.3 |
Gibsonia Road Bridge, WB414, Retaining Wall, AS 36.11 Westbound Milepost 36.2
|

Westbound MP 32, Open 3 Lanes of Traffic to Toll Plaza |

Pearce Mill Road Bridge, WB409, Eastbound-Milepost 33.57 |

Graham Road Bridge, WB407, Eastbound-Milepost 32.82 |

Pearce Mill Road Bridge, WB409, Eastbound-Milepost 33.57 |

Bakerstown Warrendale Road Bridge, WB406B, Westbound-Milepost 31.97 |

Westbound Paving, MP 31.8 |

Westbound Paving, MP 31.9 |
WB-409 Pearce Mill Road, M.P. 33.57
|

WB-406B Bakerstown Warrendale Road Bridge, Dry Run for Approach Slab, M.P. 31.97 |

WB-406B Bakerstown Warrendale Road Bridge, 9-15-12 Opening, M.P. 31.97 |

WB-406B Bakerstown Warrendale Road Bridge, 9-15-12 Opening, M.P. 31.97 |

WB-406 Bakerstown/Warrendale Rd. Existing Structure Demolition, M.P. 31.97 |

WB-407 Graham Road detour removed and open to traffic, M.P. 32.82 |

WB-409 Pearce Mill Rd. Bridge Approach Slab Rebar Placement, M.P. 33.57 |

WB-409 Pearce Mill Rd. detour removed and open to traffic, M.P. 33.57 |

WB-409 Pearce Mill Rd. Bridge Existing Structure Demolition |

WB-409 Pearce Mill Rd. Bridge looking West, M.P. 33.57 |

WB-409 Pearce Mill Rd. Bridge Deck Rebar Placement, M.P. 33.57 |

WB-409 Pearce Mill Rd. Bridge Deck Placement, M.P. 33.57 |

WB-409 Pearce Mill Rd. Bridge Deck Blockout Pour, M.P. 33.57 |

WB-409 Pearce Mill Rd. Bridge Slope Wall Installation |

WB411 Old State Road Bridge, Stage 4 Dry Run for Deck Pour, Milepost 35.31 |

June 23, 2012 - Opening of WB411 Old State Road, Milepost 35.31 |

Milepost 36.2, Looking West
|

Stage 4 Westbound Undercut, Milepost 31.5 - Sta 145+00 |

Stage 4, Westbound Subbase Placement, Milepost 33.3 - Station 238+00 |

Pearce Mill Road Bridge, WB409, Westbound-Milepost 33.57 |

WB411 Old State Road Bridge, Stage 4 Beam Set, Milepost 35.31 |

WB411 Old State Road Bridge, Stage 4 Beam Set, Milepost 35.31 |

WB407 Graham Road Bridge, Stage 4 Beam Set, Westbound-Milepost 32.82 |

WB411 Old State Bridge Road Sub Grade Compaction, Milepost 35.31 |

Undercut and backfill, Sta 233+16, Westbound-Milepost 33.2 |

Pearce Mill Road Bridge, WB409, Eastbound-Milepost 33.57 |

Old State Road Bridge, WB411, Slope Protection, Milepost 35.31 |

Graham Road Bridge, Westbound-Milepost 32.82 |

WB406 Culvert, Rock Apron for Storm Water Pond, Westbound-Milepost 31.55 |

Pearce Mill Road Bridge, WB409, Abutment 1, Westbound-Milepost 33.57 |

Old State Road Bridge, WB411, Milepost 35.31
|

Bakerstown Warrendale Road Bridge, WB406B, Abutment 1, Westbound-Milepost 31.97 |

Relocated VMS Sign Control Panels, Westbound-Milepost 33 |

Pile Driving, Pearce Mill Road Bridge, WB409, Westbound-Milepost 33.57 |

Pipe Operation, Old State Road Bridge, WB411, Milepost 35.31
|

Pre Drilling at Bakerstown Warrendale Road Bridge, WB406B, Westbound-Milepost 31.97 |

WB-406 Culvert, Westbound, Curing Covers for Concrete Placement, Milepost 31.55 |

Slope Excavation, Pearce Mill Road Bridge, WB409, Milepost 33.57 Westbound
|

Pile Driving, Old State Road Bridge, WB411, Milepost 35.31 |

Haul Road at Pearce Mill Road Bridge, WB409, Milepost 33.57, Looking West |
|