Roadway & Bridge Reconstruction MP 31.04 to 37.82:
Travel Advisory
Travel Advisory
SEPTEMBER 2010

OCCASIONAL SINGLE LANE CLOSURES:

7:00 PM - 7:00 AM, MONDAY THRU THURSDAY EASTBOUND
7:00 PM FRIDAY - 11:00 AM SATURDAY EASTBOUND
4:00 PM SATURDAY - 11:00 AM SUNDAY EASTBOUND
7:00 PM - 7:00 AM, MONDAY THRU THURSDAY WESTBOUND
8:00 PM FRIDAY - 11:00 AM SATURDAY WESTBOUND
4:00 PM SATURDAY - 1:00 PM SUNDAY WESTBOUND

NOTE:
EB & WB, ALL SHOULDERS CLOSED, TRUCKS & BUSES LEFT LANE ONLY.  EMERGENCY PULL-OFFS ARE LOCATED AT ONE (1) MILE INTERVALS.  CALL BOXES FROM MP 31 TO
MP 38 ARE OUT OF SERVICE DUE TO CONSTRUCTION UNTIL FURTHER NOTICE.

Travel Advisory - Old State Road
A portion of Old State Road in Pine Township will close for Bridge Replacement
Begining August 31, 2009 continuing until mid summer 2012

On Monday, Aug. 31 at 7 a.m., a portion of Old State Road between Whippoorwill Hill Road and Fox Hollow Lane in Pine Township, Allegheny County, will be closed to allow for the replacement of a PA Turnpike bridge. The closure will be in effect until mid summer, 2012.

Traffic will be directed to a 3-mile, PennDOT-approved, detour via State Route 910 (Gibsonia Road), State Route 4031 (Babcock Boulevard) and State Route 4068 (Bakerstown-Warrendale Road). Detour signs will be posted, and drivers can anticipate an additional 10 minutes to navigate the detour.

The bridge carrying the PA Turnpike over Old State Road will be removed and replaced with a new, concrete I-beam structure, and a portion of Old State Road will be realigned and reconstructed as part of the Turnpike’s total reconstruction project between mileposts 31 and 38. Due to the realignment of Old State Road and three-stage construction of the structure, Old State Road must remain closed while the Turnpike is reconstructed over this structure.

Pennsylvania Turnpike Commission Press Release (pdf format)

Travel Advisory - Graham Road
A portion of Graham Road in Pine Township will close for Bridge Replacement
Begining August 24, 2009 continuing until mid summer 2012

On Monday, Aug. 24 at 7 a.m., a portion of Graham Road between Pearce Mill Road and English Road in Pine Township, Allegheny County, will be closed to allow for the replacement of a PA Turnpike bridge.  The closure will be in effect until mid summer, 2012.

A 3-mile, PennDOT-approved, detour via Pearce Mill Road and Bakerstown-Warrendale Road will be in place throughout the closure.  Detour signs will be posted, and drivers can anticipate an additional 10 minutes to navigate the detour.

The bridge carrying the PA Turnpike over Graham Road will be removed and replaced with a new steel-beam structure as part of the Turnpike’s total reconstruction project between mileposts 31 and 38.  Due to existing vertical clearance and three-stage construction, Graham Road must remain closed while the Turnpike is reconstructed over this structure.

Pennsylvania Turnpike Commission Press Release (pdf format)

Travel advisories are periodically updated. Check back often for the latest news on construction activity that may affect your journey.