PA Turnpike > Proposed Construction Projects > Milepost 320-326 Widening
Milepost 320-326 Widening

PROJECT OVERVIEW

Noise Impact Analysis

This report describes the methodology and presents the findings of the traffic noise study conducted for the full-depth reconstruction project from Milepost 320 to 326 of the Pennsylvania Turnpike in Chester and Montgomery Counties, Pennsylvania. The full-depth reconstruction project will convert the existing four-lane roadway with a 10-foot median to a six-lane typical section with a 26-foot median. The purpose of the traffic noise study is (1) to determine if project-related noise impacts will occur and (2) to determine whether noise abatement for affected areas in the form of noise barriers or other mitigation measures would be warranted, feasible, and reasonable, based upon Federal Highway Administration (FHWA) and Pennsylvania Department of Transportation (PennDOT) criteria as utilized by the Pennsylvania Turnpike Commission (PTC).

Please use the Contact Us page to communicate with the project team.

Noise Impact Analysis Report
The Noise Impact Analysis Report is a very large file (approximately 43MB).  Depending on your internet connection, downloading time may vary from 5 minutes to 25 minutes.

Publication 24 – PennDOT Project Level Highway Traffic Noise Handbook

FHWA Highway Traffic Noise

Making Sound Decisions about Highway Noise Abatement