Project Photos
Rubblization of existing concrete pavement for use as a base for new pavement structure.
 
Removal of existing pavement and preparation of subgrade during total reconstruction of Eastbound entrance ramp.
 
Installation of new median storm water inlet and drainage pipe.
 
Installation of temporary geogrid wall to support Stage2 pavement structure during Stage 3 total reconstruction.
 
Construction of new concrete pavement on top of Asphalt Treated Permeable Base (ATPB) for Eastbound entrance ramp.
 
Abrasive blast/dust collection system utilized during cleaning and painting operations
 
New median inlets, and preparation of subgrade and subase during Stage 2 reconstruction
 
Final preparation of subbbase prior to paving
 
Placement of Asphalt Treated Pemeable Base (ATPB) for Stage 2 total reconstruction
 
 

  Back to Top
 
Photos Last Updated: 9.16.05