| Rubblization
of existing concrete pavement for use as a base
for new pavement structure. |
| |
 |
| Removal
of existing pavement and preparation of subgrade
during total reconstruction of Eastbound entrance
ramp. |
| |
 |
| Installation
of new median storm water inlet and drainage
pipe. |
| |
 |
| Installation
of temporary geogrid wall to support Stage2
pavement structure during Stage 3 total reconstruction. |
| |
 |
| Construction
of new concrete pavement on top of Asphalt Treated
Permeable Base (ATPB) for Eastbound entrance
ramp. |
| |
 |
| Abrasive
blast/dust collection system utilized during
cleaning and painting operations |
| |
 |
| New
median inlets, and preparation of subgrade and
subase during Stage 2 reconstruction |
| |
 |
| Final
preparation of subbbase prior to paving |
| |
 |
| Placement
of Asphalt Treated Pemeable Base (ATPB) for
Stage 2 total reconstruction |
| |
| |